Skip to content
Supply Bid
Early access

Quote the takeoff without retyping it.

The contractor's material list arrives as data.

A quote in Aggrado Supply Bid: its lines, and what each makes before freight, after freight and net
The request

The takeoff arrives as data, not a PDF.

A contractor on Aggrado Site sends its material list and structure schedule straight in: sizes, depths and quantities as their estimator wrote them.

  • Stock lines priced from your matrix
  • Revisions come in as revisions
  • Your quote reaches their bid to compare
A contractor's request in Aggrado Supply Bid: where it goes and how to get in, their plan set, and the material list
The plant

Structures go to the precaster through you.

Send the structures to one plant or split them across two. The plant's price comes back as your cost, and only your price goes on to the contractor.

A quote in Aggrado Precast: each structure sized and priced, with freight by the truckload
Also in the box

More in Supply Bid.

  • Margin after freightFreight costed from the load plan, per line.
  • Rebates in the lineNet of what the manufacturer pays back.
  • Quotes that holdDrafts reprice; sent quotes keep their price.
  • Margin watchSent quotes against today's cost.
  • Price replayEvery step the matrix took.
  • Data sheetsCut sheets kept once, for every quote.
  • Won to invoicedOrder, POs, loads and invoice, one record.
  • Won or lostAnd why it was lost, recorded.

Put Supply Bid on your next job.

It's in early access: leave your email and we'll set it up with you.