7:42Aggrado Field●●●

Oct 10, 2026

2601 Mallard Ridge — Storm Drainage

Foreman Marcus Hill

Crew · 54 h

  • Marcus Hill Foreman9 h
  • Tony Reyes Operator9 h
  • Sam Carter Pipe layer9 h
  • Tomas Ybarra Laborer9 h
  • Jamal Price Laborer9 h
  • Ray Dunn Truck driver9 h

Put in today

  • 18" RCP168 LF
  • Curb inlets1 EA
  • Erosion control300 LF

The same card in the office, hours by cost code

Approved cards post to job cost the same day: labor at each person's rate, machines at their rates, quantities against the budget.

  • Marcus Hill
    02-110 Erosion control
    02-200 Mass excavation
    03-320 18" RCP
    6
    03-400 Curb inlets
    3
  • Tony Reyes
    02-110 Erosion control
    02-200 Mass excavation
    03-320 18" RCP
    9
    03-400 Curb inlets
  • Sam Carter
    02-110 Erosion control
    02-200 Mass excavation
    03-320 18" RCP
    7
    03-400 Curb inlets
    2
  • Tomas Ybarra
    02-110 Erosion control
    02-200 Mass excavation
    03-320 18" RCP
    7
    03-400 Curb inlets
    2
  • Jamal Price
    02-110 Erosion control
    4
    02-200 Mass excavation
    03-320 18" RCP
    5
    03-400 Curb inlets
  • Ray Dunn
    02-110 Erosion control
    02-200 Mass excavation
    9
    03-320 18" RCP
    03-400 Curb inlets
  • Machine EX-3
    02-110 Erosion control
    02-200 Mass excavation
    03-320 18" RCP
    8.5
    03-400 Curb inlets
  • Machine D-12
    02-110 Erosion control
    02-200 Mass excavation
    6
    03-320 18" RCP
    03-400 Curb inlets
  • Machine T-21
    02-110 Erosion control
    02-200 Mass excavation
    9
    03-320 18" RCP
    03-400 Curb inlets