Waiting on the firm62 late
Recommended this period$339,325of $356,820 claimed
Permits expiring in 30 days1
Construction needs attention
Across every project, late first. The same list comes by email each weekday morning.
- 3 days lateRFI 14: Conflict at MH-4 with the existing gas mainElm Street Sidewalk and Drainage
- 11 days latePrime Grading LLC: no payroll for 2 weeks (from Oct 4)Sugar Creek Greenway, Phase 3
- due todaySubmittal 007.1: Precast drop inletsElm Street Sidewalk and Drainage
- waitingTown of Pineville's comments to answer: Stormwater (round 2, 4 days with us)Riverbend Subdivision, Phase 1
- waitingPay estimate 6 from Carolina Site Works waiting your reviewSugar Creek Greenway, Phase 3
- waiting3 punch items the contractor says are fixed, to check (punch list 1)Riverbend Subdivision, Phase 1
Pay estimate 6 · Sugar Creek Greenway, Phase 3
From Carolina Site Works, through Oct 15, 2026. Observed is what your inspector measured on submitted daily reports.
| Item | Claimed | Observed | Engineer | Amount |
|---|---|---|---|---|
| Unclassified excavationClaimed past what was observed | 6,200 CY | 5,850 | 5,850 | $108,225 |
| Aggregate base course | 1,900 TON | 1,900 | 1,900 | $87,400 |
| 15" RC pipe culverts, Class IIIClaimed past what was observed | 640 LF | 610 | 610 | $47,580 |
| Drop inlet, NCDOT 840.14 | 10 EA | 10 | 10 | $49,000 |
| Concrete sidewalk, 5"Claimed past what was observed | 900 SY | 760 | 760 | $47,120 |
- Unclassified excavationClaimed past what was observed
- Claimed
- 6,200 CY
- Observed
- 5,850
- Engineer
- 5,850
- Amount
- $108,225
- Aggregate base course
- Claimed
- 1,900 TON
- Observed
- 1,900
- Engineer
- 1,900
- Amount
- $87,400
- 15" RC pipe culverts, Class IIIClaimed past what was observed
- Claimed
- 640 LF
- Observed
- 610
- Engineer
- 610
- Amount
- $47,580
- Drop inlet, NCDOT 840.14
- Claimed
- 10 EA
- Observed
- 10
- Engineer
- 10
- Amount
- $49,000
- Concrete sidewalk, 5"Claimed past what was observed
- Claimed
- 900 SY
- Observed
- 760
- Engineer
- 760
- Amount
- $47,120
Permits
| Number | Permit | Agency | Status |
|---|---|---|---|
| SWP-0042 | Stormwater | Town of Pineville | expires in 21 days |
| WQ0045821 | Sewer extension | NC DEQ Division of Water Resources | expires Jun 30, 2027 |
| E-10-2026-118 | Driveway encroachment | NCDOT Division 10 | expires Mar 1, 2027 |
- StormwaterTown of Pineville
- Number
- SWP-0042
- Status
- expires in 21 days
- Sewer extensionNC DEQ Division of Water Resources
- Number
- WQ0045821
- Status
- expires Jun 30, 2027
- Driveway encroachmentNCDOT Division 10
- Number
- E-10-2026-118
- Status
- expires Mar 1, 2027
Substantial completion punch list
Riverbend Subdivision, Phase 1 · walked Oct 16, 2026 with Example Grading Co.
| Number | Item | Where | Status |
|---|---|---|---|
| 1 | Inlet 4 grate not seated | Sta 12+50 Lt | Ready to check |
| 2 | Regrade swale behind lot 12 | Lot 12 | Open |
| 3 | Replace cracked sidewalk panel | Oak Ridge Dr at lot 7 | Ready to check |
| 4 | Clean out the pond's outlet structure | SCM 1 | Closed |
| 5 | Stabilize the slope at the pond | SCM 1 | Ready to check |
- Inlet 4 grate not seatedSta 12+50 Lt
- Status
- Ready to check
- Regrade swale behind lot 12Lot 12
- Status
- Open
- Replace cracked sidewalk panelOak Ridge Dr at lot 7
- Status
- Ready to check
- Clean out the pond's outlet structureSCM 1
- Status
- Closed
- Stabilize the slope at the pondSCM 1
- Status
- Ready to check